Tooele Concrete Works is a referral service that connects homeowners with licensed local concrete contractors, and it does not issue or file permits. Tooele City Community Development, below, answers for the city rules on this page. For a driveway onto a state highway, ask UDOT, and for contractor licensing, Utah's Division of Professional Licensing.
Who to ask
Tooele City Community Development handles building permits. The office is in the city offices at 90 North Main Street, Tooele, UT 84074, and is open Monday to Friday, 8:00 a.m. to 5:00 p.m. The contact is 435.843.2132 or cd@tooelecity.gov (Tooele City Community Development). Codes and fees change, so confirm each point below with that office before you sign a contract or break ground.
- Applying. The city lets applicants apply for and pay for a building permit online, in its permit portal at tooelecity.portal.iworq.net/portalhome/tooelecity (same page).
- Inspections. To schedule an inspection, the city asks applicants to email cd@tooelecity.gov (same page).
The street end: public right-of-way
City code 4-11-1 makes it unlawful to build a sidewalk, curb, gutter or related appurtenance in the public right-of-way without first having grades and lines reviewed and approved by the city and without first obtaining a building permit (Tooele City code).
In practice, the apron of a driveway, the sidewalk and the curb and gutter along your street can sit in that strip. A new approach, a widened one, or a replaced sidewalk panel are examples of work in that strip. Ask the contractor who pulls the permit and who books the inspection, and get the answer in writing.
A driveway onto a state highway is a different office. UDOT requires a conditional access permit whenever a driveway connection is requested along a state highway (UDOT access management). If your road is a state highway rather than a city street, ask UDOT.
How wide can the approach be?
Code 7-4-8 limits a drive approach on a one- or two-family lot to 30 feet or one-third of the lot frontage, whichever is less (Tooele City code). The driveway page works through two examples.
What the city wants poured at the street
Code 4-8-2.8 requires curbs, gutters, driveway approaches and sidewalks to be class 4000 psi (6.5 sack) Portland cement concrete, with 5% to 7% entrained air (same city code link). That is a city spec for public-way work. For the rest of your slab, ask the contractor for a quote that names the mix. Air entrainment is not decoration here; the American Concrete Institute says it raises resistance to freeze-thaw damage and minimizes scaling from ice-removal chemicals (ACI).
Parking an RV, trailer or boat
Code 7-4-7 says personal recreational vehicles, trailers and boats in residential zones must be parked on a hard surfaced area behind the front wall plane of the primary structure (Tooele City code). So a pad meant for parking an RV, trailer or boat has to sit behind that line; the RV pads page covers the rest. Code 7-14-6 also sets accessory buildings and structures on residential lots at least five feet from rear and side property lines, reducible to one foot only if the fire and drainage conditions it lists are met (Tooele City code). Whether a flat slab counts as an accessory structure is Community Development's call, so ask.
Work on your own lot
Code 4-1-2 requires a written permit from the Building Official before construction, alteration or repair, except where the work is minor in character as defined in the code or as determined by the Building Official (Tooele City code). Whether a patio, a private walkway or a slab behind the house counts as minor is the Building Official's call. Phone or email Community Development about your specific job.
Work done without a permit costs more. The city's fee schedule charges 2 x permit fees for work done without a permit (Tooele City fees). That schedule is also where to check current fees. If Community Development says your job needs a permit, it can give the fee and how long review takes.
Frost depth and design criteria
The city's design-criteria document gives a frost depth of 30 inches (Tooele City Building Codes and Design Criteria, dated 09-08-2026). That is a building-design figure for footings, not a measure of how deep the ground freezes each winter; for a slab, ask the contractor about air-entrained concrete and a well-compacted base.
Before anyone digs
Blue Stakes of Utah 811 asks to be notified at least 3 business days before any excavation, and says the service is free and required by law (Blue Stakes). Ask the contractor who places the call.
Checking the contractor
The state's side of this is licensing. Utah's Division of Professional Licensing runs a public Licensee Lookup and Verification System. The specialty classification for concrete work is S260 Asphalt & Concrete Contractor (Utah Commerce classification list). Utah Code 58-55-305 exempts from contractor licensing work on the alteration, repair, remodeling, addition to or improvement of a building with a contracted value under $7,000, labor and materials included (Utah Code). Whether a flatwork job falls under that is a question for the contractor and the Division of Professional Licensing.
Common questions
Who pulls the permit, the homeowner or the contractor?
Ask the contractor before the contract is signed and put the answer in writing.
Does a replacement driveway need a permit?
If the work is in the public right-of-way, code 4-11-1 applies, and Community Development says where that line is. Community Development also answers the rest. The replacement page goes through the steps.
How long does a permit take?
Community Development can tell you when you apply.
Where these numbers come from: Tooele City's code, fee schedule and design criteria; the UDOT, Utah Code and state licensing pages; Blue Stakes of Utah; and the American Concrete Institute, all linked above and read in November 2026.