Tooele Concrete WorksCall
Menu

Concrete work · Tooele, Utah

RV pads and wide parking slabs in Tooele, Utah

Adding a concrete RV pad or wide parking slab in Tooele, Utah: the city's behind-the-front-wall rule, slab thickness, base, cure time and soil questions.

Last reviewed November 2026

If a camper, boat or trailer sits on gravel or sod at your Tooele home, this page covers where the city lets you park it, what a heavy-vehicle slab needs underneath it, and how long to stay off it. Tooele Concrete Works is a referral service that connects homeowners with licensed local concrete contractors, who pour the pads.

The rule that decides where the pad goes

Tooele City code 7-4-7 says personal recreational vehicles, trailers and boats in residential zones must be parked on a hard surfaced area behind the front wall plane of the primary structure (Tooele City code).

In plain words, think of a flat plane running along the front wall of your house. An RV, trailer or boat parked in a residential zone belongs on a hard surface behind it, so a pad meant for one goes behind that line, not out in front beside the driveway. Tooele City Community Development, at 435.843.2132, can confirm how the rule applies to your lot, including a corner lot or a house set at an angle, before the contractor lays out forms. The office and its contact details are on the permits page.

Getting back there

A pad behind the house still needs a way to reach it. That can mean driving across your approach at the street, and the approach has its own limit: code 7-4-8 caps a drive approach on a one- or two-family lot at 30 feet or one-third of the lot frontage, whichever is less (same city code link). If a wider entry is part of the plan, the permit for work in the public right-of-way comes into it too. Code 4-11-1 requires city-approved grades and lines and a building permit for work there. The driveway page has the street-end details.

A flat pad out back is a different question from the approach. Code 7-14-6 sets accessory buildings and structures on residential lots at least five feet from rear and side property lines, reducible to one foot only if the fire and drainage conditions it lists are met (Tooele City code). Whether a ground-level slab counts as an accessory structure is the city's call, so ask Community Development.

What a heavy vehicle asks of the slab

A slab that is fine for a sedan can fail under a loaded trailer. Here is what to look for in a written quote.

  • Thickness. Concrete Network says 4 inches is generally enough for cars and SUVs, and that heavier trucks or a large RV may call for 5 or 6 inches (thickness guide).
  • Base. At least 4 inches of compacted subbase and base in total (Concrete Network). Under a heavy slab, ask the contractor what depth they plan and why.
  • Steel. Wire mesh generally suits slabs 4 to 5 inches thick, and rebar suits 5 inches or more (thickness guide). Fibers do not provide structural reinforcement like steel (Concrete Network).
  • Joints. 8 to 12 feet apart on a 4-inch slab (Concrete Network). Ask where the joints fall relative to where the tires will sit.
  • Mix. Concrete Network advises at least 4,000 psi and a water-cement ratio below 0.50 (mix guide).

That list is what to ask for. The contractor decides the design.

What is under the pad

The Utah Geological Survey says expansive soil is a hazard in Tooele Valley, and that a shallow ground-water hazard may be found there (Special Study 96). It is a valley-wide study, not a lot-by-lot map. A heavy slab on soil that swells and shrinks can crack or tilt, so ask the contractor to look at your lot's soil and tell you what they see. The city's design criteria list a frost depth of 30 inches (Tooele City design criteria), a building-design figure for footings, not a measure of how deep the ground freezes. Water running under a slab can cause settling, so ask where yours will drain.

How long before the RV goes on

Each stage has its own wait.

  • Foot traffic: wait at least 24 hours (Concrete Network).
  • Cars: typically seven days after placement, when the concrete has about 70% of its strength (Concrete Network).
  • RVs and large trucks: at least 28 days (same page).

Four weeks is a long time for a camper that wants to leave for the weekend. Plan the pour for a stretch when the rig has somewhere else to be. Curing matters beyond the clock. The American Concrete Institute says no detail of concrete construction improves strength and durability as cheaply as better curing (ACI). Ask how the contractor will cure it.

Winter on a pad

Think about how the pad will be cleared of snow before the first storm. Avoid any deicers the first winter after placement, because new concrete is more susceptible to salt damage (Concrete Network). A mix with entrained air, usually 4 to 7 percent of the volume, gives freezing water room to expand (Portland Cement Association). Ask for it.

Common questions

Can the pad go beside the driveway, in front of the house?

Per code 7-4-7, parking of personal RVs, trailers and boats is for the hard surface behind the front wall plane. Ask Community Development how it applies to your lot.

Does the contractor call 811?

Blue Stakes of Utah 811 asks for at least 3 business days' notice before any excavation (Blue Stakes). Ask who places it.

What does it cost?

The cost page has national per-square-foot ranges. A real quote depends on your lot, the slab thickness and the vehicle, so ask for the thickness to be itemized.

Check any contractor's license yourself on Utah's Licensee Lookup.